Welcome to visit Shinan!
Current location:front page >> Real Estate

How to evaluate mud wood acceptance

2026-01-16 03:50:31 Real Estate

How to evaluate the mud and wood acceptance? Comprehensive analysis of acceptance criteria and precautions

In the decoration process, the mud and wood work is a basic and critical link, and its quality directly affects subsequent construction and living experience. How to scientifically evaluate the mud wood acceptance results? This article combines popular discussions and industry standards across the Internet in the past 10 days to sort out structured data and practical suggestions for you.

1. Core indicators for mud wood acceptance

How to evaluate mud wood acceptance

According to industry standards and user feedback, the acceptance of mud wood needs to focus on the following six categories of indicators:

Project CategoryAcceptance criteriaFAQ
Wall flatness2 meters by ruler inspection, error ≤ 3mmWavy unevenness and blisters
Ceramic tile emptying rateSingle brick hollowing ≤5%, overall ≤3%Corners are hollow and loose in large areas
wood jointsGap ≤0.5mm, no crackingShrinkage cracks and exposed nail holes
Yin-yang angle verticalityDeviation≤3mm/2mSkew and uneven arc
waterproof layerNo leakage in closed water test for 48 hoursWater seepage in corners and leakage around pipes
Material consistencyComply with the brand/model specified in the contractRepossessing goods as good ones, secretly changing batches

2. Preparation list of acceptance tools

Tool namePurposealternative
2 meters rulerCheck wall/floor flatnessLong straight wooden strip + feeler gauge
Empty drum hammerCheck tile hollowingCoin tapping sound
laser levelMeasure verticality/levelnessHanging hammer + square ruler
tape measureCheck sizeMobile phone ranging APP

3. Solutions to high-frequency problems

According to the analysis of recent complaint data from decoration forums, the three typical problems and solutions during the mud-wood stage are as follows:

1. Repair tile hollows

If hollow drums are found, they need to be dealt with according to the situation: hollow drums at the corners can be repaired by pouring tile adhesive; hollow drums in the center that exceed 1/3 of the area need to be re-paved. Note: No hollows are allowed on floor tiles!

2. Prevention of wall cracks

Steel mesh should be hung at the joints between old and new walls, and gypsum board joints should be treated with caulking gypsum + anti-cracking tape. During the acceptance inspection, focus on checking whether there is L-shaped reinforcement at the corners of the ceiling.

3. Key points for acceptance of waterproof layer

The water level of the closed water test shall not be less than 20mm, and the owner downstairs must be notified in advance to assist in the inspection. It is recommended to install additional layers of waterproofing at weak links such as pipe roots and wall corners.

4. Timeline of acceptance process

stageWork contentTime consuming
Preliminary acceptanceCheck materials/base treatment0.5 days
Interim acceptanceConcealed engineering inspection1 day
final acceptanceComprehensive quality inspection2-3 days

5. TIPs for owner acceptance self-inspection

1. It is recommended to conduct inspection on rainy days to make it easier to detect water seepage problems.
2. Shine a flashlight on the wall at an angle to detect slight unevenness.
3. Use A4 paper to test the gaps between doors and windows. They should not be able to twitch freely.
4. Check all drainage slopes and pour water to test flow rate

Through the systematic acceptance process and quantitative standards, the quality of mud and wood projects can be effectively controlled. If any unqualified items are found, the builder must be asked to make corrections and re-inspect to ensure that there are no hidden dangers after move-in. The recently hotly debated topic of "Renovation Regret Pill" also proves that: Strict acceptance in the early stage will save you money wasted in the later stage!

Next article
  • How to evaluate the mud and wood acceptance? Comprehensive analysis of acceptance criteria and precautionsIn the decoration process, the mud and wood work is a basic and critical link, and its quality directly affects subsequent construction and living experience. How to scientifically evaluate the mud wood acceptance results? This article combines popular discussions and industry standards across the Internet in the
    2026-01-16 Real Estate
  • How to modify the provident fund payment base? The latest operating guide for 2024The provident fund payment base directly affects personal housing loan limits and account accumulation. The recent adjustments to provident fund policies in many places have triggered heated discussions. This article combines hotspot data from the entire network to explain in detail the base adjustment process, precautions and the lates
    2026-01-13 Real Estate
  • How to get to Haikou Wanda PlazaRecently, Haikou Wanda Plaza has become a popular business district, attracting a large number of tourists and local citizens for shopping and entertainment. This article will provide you with a detailed route guide, as well as hot topics and content on the Internet in the past 10 days to help you better plan your itinerary.1. Transportation Guide to Haikou Wanda PlazaHaikou Wanda Plaz
    2026-01-11 Real Estate
  • How to apply for Xi'an provident fund cardWith the acceleration of urbanization in Xi'an, more and more citizens are beginning to pay attention to the relevant policies and procedures of provident funds. Provident fund card is an important tool for withdrawing and using provident funds, and its handling method has attracted much attention. This article will introduce in detail the application process, required materi
    2026-01-08 Real Estate
Recommended articles
Reading rankings
Friendly links
Dividing line